Taseko (Gibraltar Mine) - Process Tanks


Taseko (Gibraltar Mine) –  Process Tanks

Job # 1515                   Weight 75,000 lbs

Unifab was awarded a project to design, fabricate, and deliver three new process tanks for a plant expansion at the Taseko Gibraltar Mine, near Williams Lake, BC.

_IGP6317 Ausenco, Taseko’s EPCM partner, administered the project and worked closely with Unifab throughout the course of this project.  Requiring installation before the cold of winter, Unifab implemented a project that few shops could match.  All three tanks were fabricated and welded in sections up to 17′ wide in the shop, to minimize field assembly.  Exceeding 16’ in diameter, required unique design and fabrication and special shipping procedures for Unifab to deliver modularized tank sections that could be installed and commissioned quickly.